1/4 »
Construction of a water reservoir and potable water transfer to the Johannesburg area.
Prefabrication of the ring segments for batches n. 3, 4 and 5 of the Toulouse subway line B.
Realisation in prestressed concrete of barge destined for the transfer of hydrocarbons.
A cable-stayed bridge to cross the Seine estuary between Le Havre and Honfleur (France).
Realisation of the pylones of the multiple cable-stayed bridge, the star work of art of the 1998 Universal …
Prefabrication of 1.100 prestressed concrete segments for the construction a 1460 m long viaduct.